Water Modelling-Modelled Data-Annual Permitted Take (APT)-Gwydir
Data and Resources
-
Data Quality Statement
PDF
Data quality statement for Water Modelling-Modelled Data-Annual Permitted...
-
416027 GilGil@Weemelah
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
416052 GilGil@Galloway
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418001 Gwydir@Pallamallawa
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418004 Gwydir@Yarraman
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418007 Gwydir@Camurra
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418013 Gwydir@Gravesend
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418031 Gwydir@Collymongle
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418037 Mehi@DSCombadelloWeir
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418053 Gwydir@BrageenCrossing
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418055 Mehi@Collarenebri
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418064 Gingham@Willowlee
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
-
418066 Gwydir@Millewa
ZIP
The version of latest (as of 03/07/2023) APT/Current Conditions model data...
Additional Info
Identifier | |
---|---|
Description | Annual permitted take (APT) is a critical component of sustainable resource management, balancing the need for water resource utilisation with the preservation of ecosystems. It is a crucial mechanism for ensuring the long-term annual sustainable diversion limits (SDLs) set under the Murray-Darling Basin Plan are not exceeded, and that enough water is available for the environment. APT is the maximum amount of water permitted to be taken for consumptive purposes each year, and has been enforced |
S3 object key | |
Data Custodian | NSW Department of Climate Change, Energy, the Environment and Water |
Point of Contact | water.dataproducts@dpie.nsw.gov.au |
Access Rights | Open |
Security Classification | UNOFFICIAL |
Date Modified | 2024-02-26T13:28:14.662295 |
Access URL | https://datasets.seed.nsw.gov.au/dataset/water-modelling-modelled-data-annual-permitted-take-apt-gwydir |
Sensitive Data | |
File size | |
Legal Authority | |
Disposal | |
Publisher | NSW Department of Climate Change, Energy, the Environment and Water |
Keyword | WATER,WATER-Surface |
Resource Type | Dataset |
Temporal coverage from | 1895-01-01 |
Temporal coverage to | 2022-06-30 |
Update Frequency | Annual |
Publish Date | Missing |
Purpose | The data set provided contains flows at several gauges in each river system, as simulated by the annually extended APT model. Notwithstanding the model’s inherent limitations, these are a fair representation of those we would expect under current conditions development and operation rules. They can be compared with flows simulated by other key scenario models, such as long-term average annual extraction limit (LTAAEL) model or without development (WOD) model. |
Location | non_geospatial |
Language | English |
Licence | Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International |
Data Status | |
Data Source | https://datasets.seed.nsw.gov.au/dataset/water-modelling-modelled-data-annual-permitted-take-apt-gwydir |
Spatial Coverage |
|
harvest_object_id | a4e627dd-0576-4a89-b9fd-f5344d175ed0 |
harvest_source_id | 9e7470f6-c547-4e3b-b9d6-4004873c315c |
harvest_source_title | seed-harvester |
syndicated_id | 25eb9889-6e2a-4773-a6da-7ce6459cac43 |